• Mobile Power Supply C Rail Cable Trolleys Festoon System
  • Mobile Power Supply C Rail Cable Trolleys Festoon System
  • Mobile Power Supply C Rail Cable Trolleys Festoon System
  • Mobile Power Supply C Rail Cable Trolleys Festoon System
  • Mobile Power Supply C Rail Cable Trolleys Festoon System
  • Mobile Power Supply C Rail Cable Trolleys Festoon System

Mobile Power Supply C Rail Cable Trolleys Festoon System

Standard Length: 4m, 6m
Materials of Conductor Rail: Cold Rolled Steel Sheet, Stainless Steel Sheet
Speed of Carrying Trolley: <120 M / Min
Running Life of Carrying Trolley: 32000 Hours
Application: Tobacco Machinery. Railway Goods Yard, The Port Et
Feature: Simple Structure and High Performance
Customization:

Contact Supplier

Gold Member Since 2016

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
HXDL
Type
Cable Conductor Rail
Guide Rail Material
Cold Rolled Steel Sheet
Transport Package
Wooden Case or as Per Customers Requirment.
Specification
30# 40# 60#
Trademark
Tianbao
Origin
Chongqing, China
HS Code
85444229
Production Capacity
100000 Meters Per Week

Product Description

Product Description
The HXDL crane cable lifting system components: cable track (cable rail), trolley, flat cable, hanging bracket, coupling, top and end device. 
The festoon system is widely applied to the mobile device power transmission system in the filed of Tobacco machinery, 
railway good yard and the port, etc.
 
Technique parameter:
 

1 Material: cold-rolling galvanized steel or stainless steel
2 Ambient temperature: -35ºC-90ºC
3 Trolley movement speed: V<120m/min
4 Trolley service life: 32000H

Picture

Mobile Power Supply C Rail Cable Trolleys Festoon System
Components:
  
1. C track
The trolley moving in the C -track
Include straight track abd curved section with R more than 500mm.
The length for the straight section is 4m.
It is extended with the coupling.
Model No. A B C D
HXDL-30 33 40 14 2
HXDL-40 40 40 14 2.5
HXDL-50 50 50 16 2.5
HXDL-60 63 63 18 4.5
HXDL-70 72 68 22 4.5
HXDL-100 100 100 35 5
 

2. Cable trolley
 
Towing trolley
The towing trolley, it drives the middle trolley move along the track. 
Four fully enclosed ball bearings, flexible,applied to the dense dust occasion.

Model No.
A L H R
HXDL-301 116 130 20 27
HXDL-401 116 130 20 27
HXDL-501 200 188 25 37
HXDL-601 200 188 30 37
HXDL-701 165 190 30 50
HXDL-1001 310 206 60 100


Middle trolley
 
Wheel: fully enclosed ball bearing
Cable clamp: curved soft rubber cushion
The bumper is installed in case of impact.

Model No.
A L H R
HXDL-302 55 106 25 27
HXDL-402 55 106 25 27
HXDL-502 84 128 25 37
HXDL-602 94 158 30 37
HXDL-702 160 190 30 50
HXDL-1002 260 206 60 100


3.Coupling
 
Cold-rolled steel sheet.
Bolting locking.
Extending the track.

Model No.
A B C
HXDL-303 38 48 20
HXDL-403 50 50 20
HXDL-503 60 60 22
HXDL-603 73 73 20
HXDL-703 88 88 27
HXDL-1003 114 114 45


4. Hanger bracket
Bolt locking.

Model No.
A B C L
HXDL-304 38 48 20 80
HXDL-404 50 50 20 80
HXDL-504 60 60 22 85
HXDL-604 73 73 20 130
HXDL-704 88 88 27 140
HXDL-1004 114 114 45 170


5. Top and end device
 Top device
Be installed at the top of the track to fix the cable.
Cable is connected to the power supply box and cable trolley.

Model No.
L H R
HXDL-305 90 25 27
HXDL-405 90 25 27
HXDL-505 90 25 37
HXDL-605 100 30 37
HXDL-705 120 30 50
HXDL-1005 230 60 100

 End device
Prevent the trolley slide out of the track.

Model No.
L B C
HXDL-30 90 40 20
HXDL-40 90 40 20
HXDL-50 100 40 30
HXDL-60 100 50 30
HXDL-70 120 50 60
HXDL-100 230 85 80


6.Tow arm
Fix the top trolley and the middle device.

Model
L B C
HXDL-30T 250 100 80
HXDL-40T 250 140 80
HXDL-50T 260 160 80
HXDL-60T 260 180 80
HXDL-70T 280 180 110
HXDL-100T 390 180 40X40 square tube

 
C-rail Festoon System Application:
Projiect case: sewage treatment works and application in Factory.
Mobile Power Supply C Rail Cable Trolleys Festoon System

Accessories:
Hanger: every 2 meter
Middle cable trolley: every 2 meters
Coupling: same with the track numbers
Top trolley: every line one set
Two arm: one piece each line
Top and end device: one set each line
Steel rop: L=1.2xtrack length +length of trolley stored + length to power source.

Order notice:
 1. Track length:____meter                    
 2. Cable length:____meter                      
 3. Quantity of trolley:____pcs (2m ~ 4m with a trolley)
 4. Quantity of coupling joints:___pcs (A joint is required when the guide rail is longer than 4m or 6m)
 5. Others parts will be list in our quotation.

Company profile

Mobile Power Supply C Rail Cable Trolleys Festoon System

 

Send your message to this supplier

*From:
*To:
avatar Mrs. Amy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now