JGH -Z-Y Copper Head Conductor Rail Electrical Equipment Supplies
JGH -Z-Y Assembly type rigid body sliding contact line is combined the trapezoidal electrolytic copper bar and convex type cold rolling steel base rail by the special copper cleat. This system is supported by high duty insulator, mobile supply power for the lifting equipment. Compared to angle iron and light rail sliding contact wire, the compound system is more reliable, low impedance, low power loss and energy saving. It can be applied to severe environment with high ambient temperature, corrosion gas and so. The high mechanical strength makes the rail not easy to bend and deform.
It can be frontal mounted or side mounted. As per customer's requirement, the voltage can reach over 3KV.
JGH -Z-Y system is made up of copper rail, rail bracket, electrical insulator components and external current collector.
The characteristics are heavy current, thermo stability and corrosion resistance.
It is wildly applied to the metallurgical industry, shipbuilding industry, harbor handling and so on.
Copperhead Conductor Systems are used for high-temperature, high dust, high corrosion, and other adverse circumstances.Superb quality of heavy duty of bimetallic (copper & steel) crane bar, of which the rated current ranges from 300 amperes up to 3,000 amperes enough to satisfy all the capacity for cranes running especilly at iron & steel mills, heavy industrial plants, etc.., which are exposed to extremely high temperature duing operation.
Standard application data
Nominal Current (at 100% duty cycle) [A]: 300 - 500 - 800 - 1000 - 1500 - 2000 - 3000
Nom. Voltage [V]: 600-3000 (with add. insulators)
Rail Length [mm]: 6.000
Weight(kg):24 - 26 - 30 - 36 - 51 - 72 - 120
Operating Conditions: for indoor and weather protected outdoor applications
Track Configuration: straight / easy onside adaptation to course layout
A complete set of 6 meter copper headed steel rail crane bar:
To consist of copper headed steel rail crane bar (trolley bar / bus bar), Joint keeper, Joint cover, Expansion section, Hanger clamp with insulator, Power feeder, Locating clamp, Pantograph collector, etc.
Detailed specifications and photos of each component are available upon request.
Maintenance
--After installation,Make sure that the sliding hangers are straight (in a perpendicular position) after nuts have been tightened to guarantee free sliding of the powerail.The powerail must be installed exactly straight and parallel to the machinery track.
--Before running the powerail,Check the system for esay running of the current collector trolleys,i.e.there may be no resistance by an excessively narrow slot or pull by the connecting cable.
--Every 3 up to max.12 months,-depending on the frequency of operation and travel distance-,check the carbon brushes and mechanical componets for wear and replace
them if necessary.