Overhead Crane Cable Management System C Steel Track

Product Details
Customization: Available
Standard Length: 4m, 6m
Materials of Conductor Rail: Cold Rolled Steel Sheet, Stainless Steel Sheet
Gold Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
OEM/ODM Availability
Yes
  • Overhead Crane Cable Management System C Steel Track
  • Overhead Crane Cable Management System C Steel Track
  • Overhead Crane Cable Management System C Steel Track
  • Overhead Crane Cable Management System C Steel Track
  • Overhead Crane Cable Management System C Steel Track
  • Overhead Crane Cable Management System C Steel Track
Find Similar Products

Basic Info.

Model NO.
HXDL
Speed of Carrying Trolley
<120 M/M
Running Life of Carrying Trolley
32000 H
Application
Tobacco Machinery. Railway Goods Yard, The Port Et
Feature
Simple Structure and High Performance
Transport Package
Ply Wood Case
Specification
30# 40# 60#
Trademark
Tianbao
Origin
Chongqing
HS Code
84314999
Production Capacity
10000 Meters Per Month

Product Description

Product description 
 
The HXDL cable management system components: cable track (cable rail), trolley, flat cable, hanging bracket, coupling, top and end device. 
The festoon system is widely applied to the mobile device power transmission system in the filed of Tobacco machinery, railway good yard and the port, etc.
 
Technique parameter:

 
1 Material: cold-rolling galvanized steel or stainless steel
2 Ambient temperature: -35ºC-90ºC
3 Trolley movement speed: V<120m/min
4 Trolley service life: 32000H
 
Picture
Overhead Crane Cable Management System C Steel Track

Components:
  
1. C rail
The trolley moving in the C rail
Include straight track abd curved section with R more than 500mm.
The length for the straight section is 4m.
It is extended with the coupling.
Model No. A B C D
HXDL-30 33 40 14 2
HXDL-40 40 40 14 2.5
HXDL-50 50 50 16 2.5
HXDL-60 63 63 18 4.5
HXDL-70 72 68 22 4.5
HXDL-100 100 100 35 5

2. Cable trolley
 
Towing trolley
The towing trolley, it drives the middle trolley move along the track. 
Four fully enclosed ball bearings, flexible,applied to the dense dust occasion.
Model No. A L H R
HXDL-301 116 130 20 27
HXDL-401 116 130 20 27
HXDL-501 200 188 25 37
HXDL-601 200 188 30 37
HXDL-701 165 190 30 50
HXDL-1001 310 206 60 100

Middle trolley
 
Wheel: fully enclosed ball bearing
Cable clamp: curved soft rubber cushion
The bumper is installed in case of impact.
Model No. A L H R
HXDL-302 55 106 25 27
HXDL-402 55 106 25 27
HXDL-502 84 128 25 37
HXDL-602 94 158 30 37
HXDL-702 160 190 30 50
HXDL-1002 260 206 60 100

3.Coupling
 
Cold-rolled steel sheet.
Bolting locking.
Extending the track.
Model No. A B C
HXDL-303 38 48 20
HXDL-403 50 50 20
HXDL-503 60 60 22
HXDL-603 73 73 20
HXDL-703 88 88 27
HXDL-1003 114 114 45

4. Hanger bracket
Bolt locking.
Model No. A B C L
HXDL-304 38 48 20 80
HXDL-404 50 50 20 80
HXDL-504 60 60 22 85
HXDL-604 73 73 20 130
HXDL-704 88 88 27 140
HXDL-1004 114 114 45 170

5. Top and end device
 Top device
Be installed at the top of the track to fix the cable.
Cable is connected to the power supply box and cable trolley.
Model No. L H R
HXDL-305 90 25 27
HXDL-405 90 25 27
HXDL-505 90 25 37
HXDL-605 100 30 37
HXDL-705 120 30 50
HXDL-1005 230 60 100
 End device
Prevent the trolley slide out of the track.
Model No. L B C
HXDL-30 90 40 20
HXDL-40 90 40 20
HXDL-50 100 40 30
HXDL-60 100 50 30
HXDL-70 120 50 60
HXDL-100 230 85 80

6.Tow arm
Fix the top trolley and the middle device.

Application
Overhead Crane Cable Management System C Steel Track

Configuration of cable trolley and accessories:
 
Hanger: every 2 meter
Middle cable trolley: every 2 meters
Coupling: same with the track numbers
Top trolley: every line one set
Two arm: one piece each line
Top and end device: one set each line
Steel rop: L=1.2xtrack length +length of trolley stored + length to power source.

Order notice:

 1. Track length:____meter                    
 2. Cable length:____meter                      
 3. Quantity of trolley:____pcs (2m ~ 4m with a trolley)
 4. Quantity of coupling joints:___pcs (A joint is required when the guide rail is longer than 4m or 6m)
 5. Others parts will be list in our quotation.

Company profile
Overhead Crane Cable Management System C Steel Track

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier